#12 Tee Renovation


The first step the this renovation was removal of old sod and leveling of tee.




Jordan, Jordan, and Dan admire zoysia sod during installation. A starter fertilizer was applied to tee prior to laying of sod




In the foreground is the Kubota tractor used for rolling out the 30 yard zoysia rolls. The rolls are picked up then rolled out backwards.




Sod is immediately drenched in and kept closed until sod has tacked down. In this instance tee was sodded in the middle of August and was open by the first week of September.




A picure of the finished tee after the Zoysia has gone dormant.