
Here is an update on the road construction on Pierce Lane. They were hoping to allow access thru by 1/1/10. This picture is from bridge back toward Rolling Hills
There will be a sidewalk on the left.

The left half of the road has been poured looking South from the bridge.

Looking North down towards the bridge

A look from the Stamper/Pierce intersection which is open. Sidewalk to be on right.

No comments:
Post a Comment